Wulate Zhong wind energy resources account for one-twelfth of wind energy resources, accounting for a quarter of regional wind energy resources effectively, can be developed wind area of 15,000 square kilometers, in theory, could develop 30 million kilowatts. National Development and Reform Commission has determined that the flag of the autonomous state-level base of 1 million kilowatts of wind power generator has been planned in the “Eleventh Five-Year” complete wind power installed capacity of 3,000,000 kilowatts, “12 5″ complete wind power installed capacity of 500 million kilowatts, “13 5″ complete home wind generators installed capacity of 10 million kilowatts. But the current problem is: the flag were to rely on wind power output of 110 kV, 220 kV and 500 kV transformer stations and other three to complete. 110 kV and 220 kV substation has reached the capacity limit of 500 kV substation capacity will soon overrun, with plenty of time in the wind, 62% of the wind turbines output of the problem as limited.
Recommendation: Autonomous Region in the flag area in the vicinity of wind power development planning and construction of 500 kV pooling station, Block l, building a high pressure output line, using high pressure lines for delivery of wind power Wulate Zhong power.
Tags: Wind power